Birch Creek
Birch Creek has 28 planned power projects totaling 2.3 GW and 8 operating projects totaling 285.8 MW in the FieldProspects database. 46% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 2 contacts at the company are on file.
Where Birch Creek's planned pipeline sits
Planned MW by state. The 5 largest states hold 2.3 GW of the 2.3 GW.
Largest states
- Texas1.9 GW20 projects, 86% of planned
- Pennsylvania155.7 MW5 projects, 7% of planned
- Missouri66 MW1 project, 3% of planned
- Kentucky54 MW1 project, 2% of planned
- Illinois50 MW1 project, 2% of planned
for every MW Birch Creek operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 20 | 1.9 GW | 8 | 285.8 MW |
| Battery Storage | 8 | 317.8 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Birch Creek's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 5 | 322.4 MW |
| 2027 | 6 | 181.6 MW |
| 2028 | 11 | 988.3 MW |
| 2029 | 6 | 759.2 MW |
Pipeline by grid and queue year
Birch Creek's planned MW leans on ERCOT, PJM Interconnection and Midcontinent ISO (MISO). ERCOT alone holds 86% of it.
Planned MW by grid operator
28 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 20 | 1.9 GW |
| PJM Interconnection | 6 | 209.7 MW |
| Midcontinent ISO (MISO) | 2 | 116 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2024 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 3 | 115.7 MW |
| 2020 | 3 | 94 MW |
| 2021 | 2 | 61.4 MW |
| 2022 | 1 | 402 MW |
| 2023 | 3 | 201.3 MW |
| 2024 | 11 | 1.1 GW |
| 2025 | 2 | 41.9 MW |
Changes since the June 4, 2026 snapshot
What moved in Birch Creek's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Birch Creek's pipeline moves.
Birch Creek against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Birch Creek ranks 71 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 71 | Birch Creek this page | 28 | 8 | 0.13 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Birch Creek2 people at Birch Creek
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 managers are where interconnection and procurement decisions start.
By seniority
2 contacts
View as table
| Seniority | Contacts |
|---|---|
| Manager | 2 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Birch Creek project
All 36 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 2 contacts.
Get alerts for Birch Creek
We email you when Birch Creek adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Birch Creek project and the 2 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.