Berkshire Hathaway Energy
Berkshire Hathaway Energy has 9 planned power projects totaling 238 MW and 5 operating projects totaling 369 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 4 states and 3 technologies.
Where Berkshire Hathaway Energy's planned pipeline sits
Planned MW by state. The 2 largest states hold 238 MW of the 238 MW.
Largest states
- California188 MW8 projects, 79% of planned
- Nebraska50 MW1 project, 21% of planned
for every MW Berkshire Hathaway Energy operates today. Wind is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 4 | 96 MW | 3 | 267.4 MW |
| Battery Storage | 4 | 92 MW | 2 | 101.6 MW |
| Wind | 1 | 50 MW | 0 | 0 MW |
MW by technologyWind has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Berkshire Hathaway Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 8 | 188 MW |
| 2027 | 1 | 50 MW |
Pipeline by grid and queue year
Berkshire Hathaway Energy's planned MW leans on California ISO (CAISO) and Southwest Power Pool (SPP). California ISO (CAISO) alone holds 79% of it.
Planned MW by grid operator
9 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 8 | 188 MW |
| Southwest Power Pool (SPP) | 1 | 50 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2016 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 5 | 144 MW |
Berkshire Hathaway Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Berkshire Hathaway Energy ranks 443 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 443 | Berkshire Hathaway Energy this page | 9 | 5 | 1.55 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Berkshire Hathaway EnergyEvery Berkshire Hathaway Energy project
All 14 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Berkshire Hathaway Energy
We email you when Berkshire Hathaway Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Berkshire Hathaway Energy project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.