Berkshire Hathaway Energy

Power developer14 projects on record Data as of

Berkshire Hathaway Energy has 9 planned power projects totaling 238 MW and 5 operating projects totaling 369 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 4 states and 3 technologies.

238MW
planned, 9 projects
369MW
operating, 5 projects
238MW
interconnection agreement signed, 100% of planned
94MW
under construction, 4 projects
0MW
past due, 0 projects
4
states
Map

Where Berkshire Hathaway Energy's planned pipeline sits

Planned MW by state. The 2 largest states hold 238 MW of the 238 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California188 MW8 projects, 79% of planned
  2. Nebraska50 MW1 project, 21% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.6MW planned

for every MW Berkshire Hathaway Energy operates today. Wind is most of the gap.

PlannedOperating
Solar 96 MW
267.4 MW
Battery Storage 92 MW
101.6 MW
Wind 50 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar496 MW3267.4 MW
Battery Storage492 MW2101.6 MW
Wind150 MW00 MW

MW by technologyWind has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed238 MW, 100%
9 of 9 planned projects (100%)
Under construction94 MW, 39%
4 of 9 planned projects (44%)
Past due0 MW, 0%
0 of 9 planned projects (0%)
0% of Berkshire Hathaway Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Berkshire Hathaway Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 188 MW 2026 2027
View as table
YearProjectsMW
20268188 MW
2027150 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Berkshire Hathaway Energy's planned MW leans on California ISO (CAISO) and Southwest Power Pool (SPP). California ISO (CAISO) alone holds 79% of it.

Figure 2

Planned MW by grid operator

9 planned projects

California ISO (CAISO) 188 MW 8 projects
Southwest Power Pool (SPP) 50 MW 1 project
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)8188 MW
Southwest Power Pool (SPP)150 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2016 was the biggest year.

050100150 144 MW 2016
View as table
Queue yearProjectsMW
20165144 MW
Source. 4 projects without a queue date are left out MW

Berkshire Hathaway Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Berkshire Hathaway Energy ranks 443 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
443 Berkshire Hathaway Energy this page 9
238 MW
5
369 MW
1.55

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Berkshire Hathaway Energy

Every Berkshire Hathaway Energy project

All 14 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Berkshire Hathaway EnergySort: MW, largest first 14 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
14 projects and 607 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Berkshire Hathaway Energy

We email you when Berkshire Hathaway Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Berkshire Hathaway Energy project, with its county, dates and queue status.