Belltown Power
Belltown Power has 36 planned power projects totaling 4.7 GW and 1 operating project totaling 50 MW in the FieldProspects database. 19% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 10 contacts at the company are on file.
Where Belltown Power's planned pipeline sits
Planned MW by state. Everything sits in Texas.
Largest states
- Texas4.7 GW36 projects, 100% of planned
for every MW Belltown Power operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 21 | 3 GW | 0 | 0 MW |
| Solar | 15 | 1.8 GW | 1 | 50 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Belltown Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 3 | 270.3 MW |
| 2027 | 16 | 2.3 GW |
| 2028 | 13 | 1.7 GW |
| 2029 | 3 | 377.9 MW |
| 2030 | 1 | 100.4 MW |
Pipeline by grid and queue year
Belltown Power's planned MW sits entirely in ERCOT.
Planned MW by grid operator
36 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 36 | 4.7 GW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2018 | 2 | 244.6 MW |
| 2019 | 0 | 0 MW |
| 2020 | 0 | 0 MW |
| 2021 | 1 | 208.9 MW |
| 2022 | 4 | 512.8 MW |
| 2023 | 11 | 1.4 GW |
| 2024 | 4 | 394.3 MW |
Changes since the June 4, 2026 snapshot
What moved in Belltown Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Belltown Power's pipeline moves.
Belltown Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Belltown Power ranks 35 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 35 | Belltown Power this page | 36 | 1 | 0.01 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Belltown Power10 people at Belltown Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 managers and 1 director are where interconnection and procurement decisions start.
By seniority
10 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Founder | 1 |
| VP | 3 |
| Director | 1 |
| Manager | 2 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Belltown Power project
All 37 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 10 contacts.
Get alerts for Belltown Power
We email you when Belltown Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Belltown Power project and the 10 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.