BayWa r.e.
BayWa r.e. has 11 planned power projects totaling 2 GW and 3 operating projects totaling 240 MW in the FieldProspects database. 75% of the planned capacity has an interconnection agreement and 8% is past its listed in-service date. 1 contact at the company are on file.
Where BayWa r.e.'s planned pipeline sits
Planned MW by state. The 5 largest states hold 2 GW of the 2 GW.
Largest states
- California944.6 MW6 projects, 48% of planned
- Arkansas400 MW1 project, 20% of planned
- Utah324 MW1 project, 17% of planned
- Illinois150 MW1 project, 8% of planned
- Virginia140 MW2 projects, 7% of planned
for every MW BayWa r.e. operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 8 | 1.5 GW | 3 | 240 MW |
| Battery Storage | 3 | 461 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of BayWa r.e.'s planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2023 | 1 | 150 MW |
| 2024 | 0 | 0 MW |
| 2025 | 0 | 0 MW |
| 2026 | 0 | 0 MW |
| 2027 | 5 | 740 MW |
| 2028 | 1 | 324 MW |
| 2029 | 2 | 140 MW |
| 2030 | 2 | 604.6 MW |
Pipeline by grid and queue year
BayWa r.e.'s planned MW leans on California ISO (CAISO), Midcontinent ISO (MISO) and Los Angeles Department of Water & Power. California ISO (CAISO) alone holds 48% of it.
Planned MW by grid operator
11 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 6 | 944.6 MW |
| Midcontinent ISO (MISO) | 2 | 550 MW |
| Los Angeles Department of Water & Power | 1 | 324 MW |
| PJM Interconnection | 2 | 140 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 2 | 140 MW |
| 2017 | 0 | 0 MW |
| 2018 | 3 | 330 MW |
| 2019 | 0 | 0 MW |
| 2020 | 0 | 0 MW |
| 2021 | 2 | 604.6 MW |
BayWa r.e. against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. BayWa r.e. ranks 83 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 83 | BayWa r.e. this page | 11 | 3 | 0.12 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus BayWa r.e.1 person at BayWa r.e.
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 director are where interconnection and procurement decisions start.
By seniority
1 contact
View as table
| Seniority | Contacts |
|---|---|
| Director | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every BayWa r.e. project
All 14 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 1 contact.
Get alerts for BayWa r.e.
We email you when BayWa r.e. adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every BayWa r.e. project and the 1 person behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.