Balanced Rock Power
Balanced Rock Power has 3 planned power projects totaling 335.8 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 29 contacts at the company are on file.
Where Balanced Rock Power's planned pipeline sits
Planned MW by state. The 2 largest states hold 335.8 MW of the 335.8 MW.
Largest states
- Texas309.4 MW2 projects, 92% of planned
- California26.4 MW1 project, 8% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 2 | 309.4 MW | 0 | 0 MW |
| Solar | 1 | 26.4 MW | 0 | 0 MW |
MW by technologyBattery Storage and Solar have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Balanced Rock Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 181.2 MW |
| 2027 | 0 | 0 MW |
| 2028 | 1 | 154.7 MW |
Pipeline by grid and queue year
Balanced Rock Power's planned MW leans on ERCOT and California ISO (CAISO). ERCOT alone holds 92% of it.
Planned MW by grid operator
3 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 2 | 309.4 MW |
| California ISO (CAISO) | 1 | 26.4 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2022 | 1 | 154.7 MW |
| 2023 | 1 | 154.8 MW |
Changes since the June 4, 2026 snapshot
What moved in Balanced Rock Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Balanced Rock Power's pipeline moves.
Balanced Rock Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Balanced Rock Power ranks 361 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 361 | Balanced Rock Power this page | 3 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Balanced Rock Power29 people at Balanced Rock Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 10 managers and 5 directors are where interconnection and procurement decisions start.
By seniority
29 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Founder | 1 |
| VP | 5 |
| Director | 5 |
| Manager | 10 |
| Senior | 6 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Balanced Rock Power project
All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 29 contacts.
Get alerts for Balanced Rock Power
We email you when Balanced Rock Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Balanced Rock Power project and the 29 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.