Aypa Power
Aypa Power has 12 planned power projects totaling 2.1 GW and 4 operating projects totaling 700 MW in the FieldProspects database. 45% of the planned capacity has an interconnection agreement and 14% is past its listed in-service date. 82 contacts at the company are on file.
Where Aypa Power's planned pipeline sits
Planned MW by state. The 6 largest states hold 2.1 GW of the 2.1 GW.
Largest states
- Texas468.1 MW3 projects, 22% of planned
- Colorado398.9 MW3 projects, 19% of planned
- Louisiana325 MW1 project, 15% of planned
- California320 MW2 projects, 15% of planned
- South Carolina300 MW1 project, 14% of planned
- Indiana296 MW2 projects, 14% of planned
for every MW Aypa Power operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 8 | 1.3 GW | 4 | 700 MW |
| Solar | 4 | 841.7 MW | 0 | 0 MW |
MW by technologySolar has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Aypa Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2025 | 2 | 296 MW |
| 2026 | 3 | 645 MW |
| 2027 | 3 | 562.2 MW |
| 2028 | 4 | 604.8 MW |
Pipeline by grid and queue year
Aypa Power's planned MW leans on Midcontinent ISO (MISO), ERCOT and Public Service Company of Colorado. Midcontinent ISO (MISO) alone holds 29% of it.
Planned MW by grid operator
12 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 3 | 621 MW |
| ERCOT | 3 | 468.1 MW |
| Public Service Company of Colorado | 3 | 398.9 MW |
| California ISO (CAISO) | 2 | 320 MW |
| Santee Cooper (South Carolina Public Service Authority) | 1 | 300 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 2 | 296 MW |
| 2020 | 0 | 0 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 3 | 587.2 MW |
| 2024 | 1 | 205.9 MW |
Changes since the June 4, 2026 snapshot
What moved in Aypa Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Aypa Power's pipeline moves.
Aypa Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Aypa Power ranks 74 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 74 | Aypa Power this page | 12 | 4 | 0.33 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Aypa Power82 people at Aypa Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 26 managers and 19 directors are where interconnection and procurement decisions start.
By seniority
82 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Founder | 1 |
| Partner | 1 |
| VP | 18 |
| Director | 19 |
| Manager | 26 |
| Senior | 14 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Aypa Power project
All 16 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 82 contacts.
Get alerts for Aypa Power
We email you when Aypa Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Aypa Power project and the 82 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.