Atlantica Sustainable Infrastructure
Atlantica Sustainable Infrastructure has 6 planned power projects totaling 800 MW in the FieldProspects database and no operating project on record. 75% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 21 contacts at the company are on file.
Where Atlantica Sustainable Infrastructure's planned pipeline sits
Planned MW by state. Everything sits in California.
Largest states
- California800 MW6 projects, 100% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 3 | 400 MW | 0 | 0 MW |
| Solar | 3 | 400 MW | 0 | 0 MW |
MW by technologyBattery Storage and Solar have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Atlantica Sustainable Infrastructure's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 300 MW |
| 2027 | 4 | 500 MW |
Pipeline by grid and queue year
Atlantica Sustainable Infrastructure's planned MW leans on California ISO (CAISO) and Imperial Irrigation District. California ISO (CAISO) alone holds 75% of it.
Planned MW by grid operator
6 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 4 | 600 MW |
| Imperial Irrigation District | 2 | 200 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2020 | 2 | 300 MW |
Changes since the June 4, 2026 snapshot
What moved in Atlantica Sustainable Infrastructure's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Atlantica Sustainable Infrastructure's pipeline moves.
Atlantica Sustainable Infrastructure against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Atlantica Sustainable Infrastructure ranks 201 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 201 | Atlantica Sustainable Infrastructure this page | 6 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Atlantica Sustainable Infrastructure21 people at Atlantica Sustainable Infrastructure
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 14 managers are where interconnection and procurement decisions start.
By seniority
21 contacts
View as table
| Seniority | Contacts |
|---|---|
| Head | 2 |
| VP | 1 |
| Manager | 14 |
| Senior | 4 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Atlantica Sustainable Infrastructure project
All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 21 contacts.
Get alerts for Atlantica Sustainable Infrastructure
We email you when Atlantica Sustainable Infrastructure adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Atlantica Sustainable Infrastructure project and the 21 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.