Atlantica Sustainable Infrastructure

Power developer6 projects on record Data as of

Atlantica Sustainable Infrastructure has 6 planned power projects totaling 800 MW in the FieldProspects database and no operating project on record. 75% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 21 contacts at the company are on file.

800MW
planned, 6 projects
0MW
operating, 0 projects
600MW
interconnection agreement signed, 75% of planned
300MW
under construction, 2 projects
0MW
past due, 0 projects
21
contacts on file
Map

Where Atlantica Sustainable Infrastructure's planned pipeline sits

Planned MW by state. Everything sits in California.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California800 MW6 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
800 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 400 MW
none
Solar 400 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage3400 MW00 MW
Solar3400 MW00 MW

MW by technologyBattery Storage and Solar have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed600 MW, 75%
4 of 6 planned projects (67%)
Under construction300 MW, 38%
2 of 6 planned projects (33%)
Past due0 MW, 0%
0 of 6 planned projects (0%)
0% of Atlantica Sustainable Infrastructure's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Atlantica Sustainable Infrastructure's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 300 MW 2026 500 MW 2027
View as table
YearProjectsMW
20262300 MW
20274500 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Atlantica Sustainable Infrastructure's planned MW leans on California ISO (CAISO) and Imperial Irrigation District. California ISO (CAISO) alone holds 75% of it.

Figure 2

Planned MW by grid operator

6 planned projects

California ISO (CAISO) 600 MW 4 projects
Imperial Irrigation District 200 MW 2 projects
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)4600 MW
Imperial Irrigation District2200 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

0100200300 300 MW 2020
View as table
Queue yearProjectsMW
20202300 MW
Source. 4 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Atlantica Sustainable Infrastructure's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
2
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Atlantica Sustainable InfrastructureChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Atlantica Sustainable Infrastructure's pipeline moves.

Request access

Atlantica Sustainable Infrastructure against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Atlantica Sustainable Infrastructure ranks 201 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
201 Atlantica Sustainable Infrastructure this page 6
800 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Atlantica Sustainable Infrastructure

21 people at Atlantica Sustainable Infrastructure

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 14 managers are where interconnection and procurement decisions start.

Figure 4

By seniority

21 contacts

Head 2
VP 1
Manager 14
Senior 4
View as table
SeniorityContacts
Head2
VP1
Manager14
Senior4
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 21 contacts
PersonTitleDepartmentSeniorityContact
21 contacts at Atlantica Sustainable Infrastructure for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Atlantica Sustainable Infrastructure project

All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Atlantica Sustainable InfrastructureSort: MW, largest first 6 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
6 projects and 800 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 21 contacts.

Request access

Get alerts for Atlantica Sustainable Infrastructure

We email you when Atlantica Sustainable Infrastructure adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Atlantica Sustainable Infrastructure project and the 21 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.