FieldProspects

Ashtrom Renewable Energy

Power developer3 projects on record Data as of

Ashtrom Renewable Energy has 3 planned power projects totaling 537.8 MW in the FieldProspects database and no operating project on record. 28% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 2 contacts at the company are on file.

537.8MW
planned, 3 projects
0MW
operating, 0 projects
152.3MW
interconnection agreement signed, 28% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
2
contacts on file
Map

Where Ashtrom Renewable Energy's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas537.8 MW3 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
537.8 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 383.9 MW
none
Battery Storage 153.9 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar2383.9 MW00 MW
Battery Storage1153.9 MW00 MW

MW by technologySolar and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed152.3 MW, 28%
1 of 3 planned projects (33%)
Under construction0 MW, 0%
0 of 3 planned projects (0%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of Ashtrom Renewable Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Ashtrom Renewable Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 2026 383.9 MW 2027 2028 2029
View as table
YearProjectsMW
202600 MW
20272383.9 MW
202800 MW
20291153.9 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Ashtrom Renewable Energy's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

3 planned projects

ERCOT 537.8 MW 3 projects
View as table
GridPlanned projectsPlanned MW
ERCOT3537.8 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2024 was the biggest year.

0100200300 2021 2022 2023 231.6 MW 2024 2025 2026
View as table
Queue yearProjectsMW
20211152.3 MW
202200 MW
202300 MW
20241231.6 MW
202500 MW
20261153.9 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Ashtrom Renewable Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 153.9 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Ashtrom Renewable EnergyChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Ashtrom Renewable Energy's pipeline moves.

Request access

Ashtrom Renewable Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Ashtrom Renewable Energy ranks 264 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
264 Ashtrom Renewable Energy this page 3
537.8 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Ashtrom Renewable Energy

2 people at Ashtrom Renewable Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 manager and 1 director are where interconnection and procurement decisions start.

Figure 4

By seniority

2 contacts

Director 1
Manager 1
View as table
SeniorityContacts
Director1
Manager1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 2 contacts
PersonTitleDepartmentSeniorityContact
2 contacts at Ashtrom Renewable Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Ashtrom Renewable Energy project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Ashtrom Renewable EnergySort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 537.8 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 2 contacts.

Request access

Get alerts for Ashtrom Renewable Energy

We email you when Ashtrom Renewable Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Ashtrom Renewable Energy project and the 2 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.