Arevon

Power developer21 projects on record Data as of

Arevon has 13 planned power projects totaling 2.6 GW and 8 operating projects totaling 1.5 GW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 71% is past its listed in-service date. 180 contacts at the company are on file.

2.6GW
planned, 13 projects
1.5GW
operating, 8 projects
2.6GW
interconnection agreement signed, 100% of planned
770MW
under construction, 4 projects
1.8GW
past due, 9 projects
180
contacts on file
Map

Where Arevon's planned pipeline sits

Planned MW by state. The 6 largest states hold 2.6 GW of the 2.6 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Indiana1 GW5 projects, 40% of planned
  2. Missouri400 MW2 projects, 16% of planned
  3. Arkansas400 MW2 projects, 16% of planned
  4. Illinois350 MW2 projects, 14% of planned
  5. California200 MW1 project, 8% of planned
  6. Michigan170 MW1 project, 7% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1.7MW planned

for every MW Arevon operates today. Solar is most of the gap.

PlannedOperating
Solar 2.4 GW
876.6 MW
Battery Storage 200 MW
650 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar122.4 GW5876.6 MW
Battery Storage1200 MW3650 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed2.6 GW, 100%
13 of 13 planned projects (100%)
Under construction770 MW, 30%
4 of 13 planned projects (31%)
Past due1.8 GW, 71%
9 of 13 planned projects (69%)
71% of Arevon's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Arevon's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02505007501k Snapshot year 2022 2023 820 MW 2024 2025 550 MW 2026 2027
View as table
YearProjectsMW
20222300 MW
20232480 MW
20244820 MW
20251200 MW
20263550 MW
20271200 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Arevon's planned MW leans on Midcontinent ISO (MISO) and California ISO (CAISO). Midcontinent ISO (MISO) alone holds 92% of it.

Figure 2

Planned MW by grid operator

13 planned projects

Midcontinent ISO (MISO) 2.4 GW 12 projects
California ISO (CAISO) 200 MW 1 project
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)122.4 GW
California ISO (CAISO)1200 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

05001k1.5k2k 2018 1.7 GW 2019 2020
View as table
Queue yearProjectsMW
20183500 MW
201981.7 GW
20202400 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Arevon's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
2
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: ArevonChange: any 2 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
2 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Arevon's pipeline moves.

Request access

Arevon against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Arevon ranks 62 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
62 Arevon this page 13
2.6 GW
8
1.5 GW
0.60

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Arevon

180 people at Arevon

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 78 managers and 33 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

180 contacts

C-Suite 5
Owner 1
Head 1
VP 18
Director 33
Manager 78
Senior 43
Unknown 1
View as table
SeniorityContacts
C-Suite5
Owner1
Head1
VP18
Director33
Manager78
Senior43
Unknown1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 180 contacts
PersonTitleDepartmentSeniorityContact
180 contacts at Arevon for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Arevon project

All 21 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: ArevonSort: MW, largest first 21 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
21 projects and 4.1 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 180 contacts.

Request access

Get alerts for Arevon

We email you when Arevon adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Arevon project and the 180 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.