Power developer2 projects on record Data as of

Arevia Power has 2 planned power projects totaling 1.4 GW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 2 technologies.

1.4GW
planned, 2 projects
0MW
operating, 0 projects
1.4GW
interconnection agreement signed, 100% of planned
1.4GW
under construction, 2 projects
0MW
past due, 0 projects
1
state
Map

Where Arevia Power's planned pipeline sits

Planned MW by state. Everything sits in Nevada.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Nevada1.4 GW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1.4 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 700 MW
none
Solar 700 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage1700 MW00 MW
Solar1700 MW00 MW

MW by technologyBattery Storage and Solar have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.4 GW, 100%
2 of 2 planned projects (100%)
Under construction1.4 GW, 100%
2 of 2 planned projects (100%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
None of Arevia Power's planned MW sits in the seven ISO queues, where 11% of planned MW is past due across all developers.

Share of Arevia Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 2026 1.4 GW 2027
View as table
YearProjectsMW
202600 MW
202721.4 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Arevia Power's planned MW sits entirely in Nevada Power (NV Energy).

Figure 2

Planned MW by grid operator

2 planned projects

Nevada Power (NV Energy) 1.4 GW 2 projects
View as table
GridPlanned projectsPlanned MW
Nevada Power (NV Energy)21.4 GW

Arevia Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Arevia Power ranks 110 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
110 Arevia Power this page 2
1.4 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Arevia Power

Every Arevia Power project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Arevia PowerSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 1.4 GW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Arevia Power

We email you when Arevia Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Arevia Power project, with its county, dates and queue status.