Ares North America

Power developer1 project on record Data as of

Ares North America has 1 planned power project totaling 44 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 3 contacts at the company are on file.

44MW
planned, 1 project
0MW
operating, 0 projects
44MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
3
contacts on file
Map

Where Ares North America's planned pipeline sits

Planned MW by state. Everything sits in Nevada.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Nevada44 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
44 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 44 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage144 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed44 MW, 100%
1 of 1 planned project (100%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of Ares North America's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Ares North America's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0204060 Snapshot year 2026 44 MW 2027
View as table
YearProjectsMW
202600 MW
2027144 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Ares North America's planned MW sits entirely in California ISO (CAISO).

Figure 2

Planned MW by grid operator

1 planned project

California ISO (CAISO) 44 MW 1 project
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)144 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2014 was the biggest year.

0204060 44 MW 2014
View as table
Queue yearProjectsMW
2014144 MW
Source. Every planned project has a queue date MW

Ares North America against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Ares North America ranks 693 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
693 Ares North America this page 1
44 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Ares North America

3 people at Ares North America

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 manager and 2 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

3 contacts

Director 2
Manager 1
View as table
SeniorityContacts
Director2
Manager1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 3 contacts
PersonTitleDepartmentSeniorityContact
3 contacts at Ares North America for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Ares North America project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Ares North AmericaSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 44 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 3 contacts.

Request access

Get alerts for Ares North America

We email you when Ares North America adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Ares North America project and the 3 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.