FieldProspects

Apex Energy Solutions

Power developer4 projects on record Data as of

Apex Energy Solutions has 4 planned power projects totaling 1.2 GW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 73 contacts at the company are on file.

1.2GW
planned, 4 projects
0MW
operating, 0 projects
5.9MW
interconnection agreement signed, 0% of planned
3.9MW
under construction, 1 project
0MW
past due, 0 projects
73
contacts on file
Map

Where Apex Energy Solutions' planned pipeline sits

Planned MW by state. The 2 largest states hold 1.2 GW of the 1.2 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas1.2 GW1 project, 99% of planned
  2. California10.9 MW3 projects, 1% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1.2 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Other 1.2 GW
none
Battery Storage 10.9 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Other11.2 GW00 MW
Battery Storage310.9 MW00 MW

MW by technologyOther and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed5.9 MW, 0%
2 of 4 planned projects (50%)
Under construction3.9 MW, 0%
1 of 4 planned projects (25%)
Past due0 MW, 0%
0 of 4 planned projects (0%)
0% of Apex Energy Solutions' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Apex Energy Solutions' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 2 MW 2026 2027 2028 2029 1.2 GW 2030
View as table
YearProjectsMW
202612 MW
202728.9 MW
202800 MW
202900 MW
203011.2 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Apex Energy Solutions' planned MW leans on ERCOT and California ISO (CAISO). ERCOT alone holds 99% of it.

Figure 2

Planned MW by grid operator

4 planned projects

ERCOT 1.2 GW 1 project
California ISO (CAISO) 10.9 MW 3 projects
View as table
GridPlanned projectsPlanned MW
ERCOT11.2 GW
California ISO (CAISO)310.9 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2022 was the biggest year.

05001k1.5k 1.2 GW 2022
View as table
Queue yearProjectsMW
202211.2 GW
Source. 3 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Apex Energy Solutions' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
3
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Apex Energy SolutionsChange: any 3 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
3 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Apex Energy Solutions' pipeline moves.

Request access

Apex Energy Solutions against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Apex Energy Solutions ranks 128 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
128 Apex Energy Solutions this page 4
1.2 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Apex Energy Solutions

73 people at Apex Energy Solutions

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 5 managers and 6 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

73 contacts

C-Suite 1
Owner 4
Partner 45
VP 5
Director 6
Manager 5
Senior 7
View as table
SeniorityContacts
C-Suite1
Owner4
Partner45
VP5
Director6
Manager5
Senior7
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 73 contacts
PersonTitleDepartmentSeniorityContact
73 contacts at Apex Energy Solutions for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Apex Energy Solutions project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Apex Energy SolutionsSort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 1.2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 73 contacts.

Request access

Get alerts for Apex Energy Solutions

We email you when Apex Energy Solutions adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Apex Energy Solutions project and the 73 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.