FieldProspects

Apex Clean Energy

Power developer59 projects on record Data as of

Apex Clean Energy has 41 planned power projects totaling 8 GW and 18 operating projects totaling 2.3 GW in the FieldProspects database. 74% of the planned capacity has an interconnection agreement and 21% is past its listed in-service date. 198 contacts at the company are on file.

8GW
planned, 41 projects
2.3GW
operating, 18 projects
5.9GW
interconnection agreement signed, 74% of planned
1.6GW
under construction, 10 projects
1.7GW
past due, 9 projects
198
contacts on file
Map

Where Apex Clean Energy's planned pipeline sits

Planned MW by state. The 6 largest states hold 6.6 GW of the 8 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas2.1 GW10 projects, 26% of planned
  2. Illinois2 GW10 projects, 25% of planned
  3. Ohio869.7 MW4 projects, 11% of planned
  4. Virginia585.2 MW5 projects, 7% of planned
  5. Mississippi568.5 MW2 projects, 7% of planned
  6. Oklahoma445 MW2 projects, 6% of planned

7 more states with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
3.4MW planned

for every MW Apex Clean Energy operates today. Wind is most of the gap.

PlannedOperating
Wind 4.2 GW
1.2 GW
Solar 2.3 GW
936.1 MW
Battery Storage 665.6 MW
216.4 MW
Solar + Storage (Hybrid) 568.5 MW
none
Wind + Storage (Hybrid) 300 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind174.2 GW61.2 GW
Solar152.3 GW9936.1 MW
Battery Storage6665.6 MW3216.4 MW
Solar + Storage (Hybrid)2568.5 MW00 MW
Wind + Storage (Hybrid)1300 MW00 MW

MW by technologySolar + Storage (Hybrid) and Wind + Storage (Hybrid) have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed5.9 GW, 74%
31 of 41 planned projects (76%)
Under construction1.6 GW, 20%
10 of 41 planned projects (24%)
Past due1.7 GW, 21%
9 of 41 planned projects (22%)
21% of Apex Clean Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Apex Clean Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
01k2k3k Snapshot year 2021 2022 2023 2024 2025 861.2 MW 2026 2.9 GW 2027 2028 2029
View as table
YearProjectsMW
20213493.6 MW
20221225 MW
202300 MW
20243600 MW
20252350 MW
20266861.2 MW
2027162.9 GW
20285860.6 MW
202951.7 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Apex Clean Energy's planned MW leans on Midcontinent ISO (MISO), ERCOT and PJM Interconnection. Midcontinent ISO (MISO) alone holds 42% of it.

Figure 2

Planned MW by grid operator

41 planned projects

Midcontinent ISO (MISO) 3.4 GW 16 projects
ERCOT 2.1 GW 10 projects
PJM Interconnection 1.6 GW 10 projects
Southwest Power Pool (SPP) 700 MW 3 projects
New York ISO (NYISO) 252 MW 2 projects
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)163.4 GW
ERCOT102.1 GW
PJM Interconnection101.6 GW
Southwest Power Pool (SPP)3700 MW
New York ISO (NYISO)2252 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2018 was the biggest year.

05001k1.5k 2014 2015 2016 2017 1.2 GW 2018 2019 2020 2021 2022 2023 2024
View as table
Queue yearProjectsMW
2014178.2 MW
201500 MW
20162429.6 MW
20173547.7 MW
201851.2 GW
201961.1 GW
20202305 MW
202151.1 GW
20224603.1 MW
20232445 MW
20243900.5 MW
Source. 8 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Apex Clean Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
2
cancelled, inactive or dropped
6
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Apex Clean EnergyChange: any 13 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
13 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Apex Clean Energy's pipeline moves.

Request access

Apex Clean Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Apex Clean Energy ranks 19 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
19 Apex Clean Energy this page 41
8 GW
18
2.3 GW
0.29

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Apex Clean Energy

198 people at Apex Clean Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 98 managers and 39 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

198 contacts

C-Suite 2
Founder 1
Owner 1
VP 29
Director 39
Manager 98
Senior 27
Unknown 1
View as table
SeniorityContacts
C-Suite2
Founder1
Owner1
VP29
Director39
Manager98
Senior27
Unknown1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 198 contacts
PersonTitleDepartmentSeniorityContact
198 contacts at Apex Clean Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Apex Clean Energy project

All 59 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Apex Clean EnergySort: MW, largest first 59 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
59 projects and 10.3 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 198 contacts.

Request access

Get alerts for Apex Clean Energy

We email you when Apex Clean Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Apex Clean Energy project and the 198 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.