American Electric Power

Power developer3 projects on record Data as of

American Electric Power has 2 planned power projects totaling 13.6 MW and 1 operating project totaling 49 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 53% is past its listed in-service date. The projects sit in 2 states and 2 technologies.

13.6MW
planned, 2 projects
49MW
operating, 1 project
13.6MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
7.2MW
past due, 1 project
2
states
Map

Where American Electric Power's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas13.6 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.3MW planned

for every MW American Electric Power operates today. Wind is most of the gap.

PlannedOperating
Wind 13.6 MW
none
Solar none
49 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind213.6 MW00 MW
Solar00 MW149 MW

MW by technologyWind has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed13.6 MW, 100%
2 of 2 planned projects (100%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due7.2 MW, 53%
1 of 2 planned projects (50%)
53% of American Electric Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of American Electric Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02468 Snapshot year 7.2 MW 2023 2024 2025 6.4 MW 2026
View as table
YearProjectsMW
202317.2 MW
202400 MW
202500 MW
202616.4 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

American Electric Power's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

2 planned projects

ERCOT 13.6 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT213.6 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2017 was the biggest year.

051015 13.6 MW 2017
View as table
Queue yearProjectsMW
2017213.6 MW
Source. Every planned project has a queue date MW

American Electric Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. American Electric Power ranks 741 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
741 American Electric Power this page 2
13.6 MW
1
49 MW
3.60

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus American Electric Power

Every American Electric Power project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: American Electric PowerSort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 62.6 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for American Electric Power

We email you when American Electric Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every American Electric Power project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.