Ameresco
Ameresco has 3 planned power projects totaling 62.4 MW and 34 operating projects totaling 204.7 MW in the FieldProspects database. 80% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 10 states and 2 technologies.
Where Ameresco's planned pipeline sits
Planned MW by state. The 2 largest states hold 62.4 MW of the 62.4 MW.
Largest states
- California50 MW1 project, 80% of planned
- Hawaii12.4 MW2 projects, 20% of planned
for every MW Ameresco operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 2 | 56 MW | 12 | 138.7 MW |
| Solar | 1 | 6.4 MW | 22 | 66 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Ameresco's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 50 MW |
| 2027 | 2 | 12.4 MW |
Pipeline by grid and queue year
Ameresco's planned MW leans on California ISO (CAISO) and Hawaiian Electric. California ISO (CAISO) alone holds 80% of it.
Planned MW by grid operator
3 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 1 | 50 MW |
| Hawaiian Electric | 2 | 12.4 MW |
Changes since the June 4, 2026 snapshot
What moved in Ameresco's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Ameresco's pipeline moves.
Ameresco against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Ameresco ranks 669 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 669 | Ameresco this page | 3 | 34 | 3.28 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus AmerescoEvery Ameresco project
All 37 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Ameresco
We email you when Ameresco adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Ameresco project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.