Ameren Missouri
Ameren Missouri has 4 planned power projects totaling 709.9 MW and 4 operating projects totaling 400 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 58% is past its listed in-service date. The projects sit in 2 states and 2 technologies.
Where Ameren Missouri's planned pipeline sits
Planned MW by state. The 2 largest states hold 709.9 MW of the 709.9 MW.
for every MW Ameren Missouri operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 3 | 649.9 MW | 4 | 400 MW |
| Hydro | 1 | 60 MW | 0 | 0 MW |
MW by technologyHydro has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Ameren Missouri's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2022 | 1 | 149.9 MW |
| 2023 | 0 | 0 MW |
| 2024 | 2 | 260 MW |
| 2025 | 0 | 0 MW |
| 2026 | 0 | 0 MW |
| 2027 | 1 | 300 MW |
Pipeline by grid and queue year
Ameren Missouri's planned MW sits entirely in Midcontinent ISO (MISO).
Planned MW by grid operator
4 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 4 | 709.9 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 1 | 149.9 MW |
| 2018 | 1 | 200 MW |
| 2019 | 1 | 60 MW |
| 2020 | 1 | 300 MW |
Changes since the June 4, 2026 snapshot
What moved in Ameren Missouri's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Ameren Missouri's pipeline moves.
Ameren Missouri against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Ameren Missouri ranks 226 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 226 | Ameren Missouri this page | 4 | 4 | 0.56 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Ameren MissouriEvery Ameren Missouri project
All 8 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Ameren Missouri
We email you when Ameren Missouri adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Ameren Missouri project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.