Alluvial Power
Alluvial Power has 3 planned power projects totaling 226.3 MW and 2 operating projects totaling 230 MW in the FieldProspects database. 67% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 3 states and 2 technologies.
Where Alluvial Power's planned pipeline sits
Planned MW by state. The 2 largest states hold 226.3 MW of the 226.3 MW.
for every MW Alluvial Power operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 2 | 151.5 MW | 0 | 0 MW |
| Solar | 1 | 74.8 MW | 2 | 230 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Alluvial Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 151.3 MW |
| 2027 | 0 | 0 MW |
| 2028 | 1 | 75 MW |
Pipeline by grid and queue year
Alluvial Power's planned MW leans on ERCOT and Southwest Power Pool (SPP). ERCOT alone holds 67% of it.
Planned MW by grid operator
3 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 2 | 151.3 MW |
| Southwest Power Pool (SPP) | 1 | 75 MW |
Changes since the June 4, 2026 snapshot
What moved in Alluvial Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Alluvial Power's pipeline moves.
Alluvial Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Alluvial Power ranks 445 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 445 | Alluvial Power this page | 3 | 2 | 1.02 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Alluvial PowerEvery Alluvial Power project
All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Alluvial Power
We email you when Alluvial Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Alluvial Power project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.