FieldProspects

Alluvial Power

Power developer5 projects on record Data as of

Alluvial Power has 3 planned power projects totaling 226.3 MW and 2 operating projects totaling 230 MW in the FieldProspects database. 67% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 3 states and 2 technologies.

226.3MW
planned, 3 projects
230MW
operating, 2 projects
151.3MW
interconnection agreement signed, 67% of planned
151.3MW
under construction, 2 projects
0MW
past due, 0 projects
3
states
Map

Where Alluvial Power's planned pipeline sits

Planned MW by state. The 2 largest states hold 226.3 MW of the 226.3 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas151.3 MW2 projects, 67% of planned
  2. Kansas75 MW1 project, 33% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1MW planned

for every MW Alluvial Power operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 151.5 MW
none
Solar 74.8 MW
230 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage2151.5 MW00 MW
Solar174.8 MW2230 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed151.3 MW, 67%
2 of 3 planned projects (67%)
Under construction151.3 MW, 67%
2 of 3 planned projects (67%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of Alluvial Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Alluvial Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 151.3 MW 2026 2027 2028
View as table
YearProjectsMW
20262151.3 MW
202700 MW
2028175 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Alluvial Power's planned MW leans on ERCOT and Southwest Power Pool (SPP). ERCOT alone holds 67% of it.

Figure 2

Planned MW by grid operator

3 planned projects

ERCOT 151.3 MW 2 projects
Southwest Power Pool (SPP) 75 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT2151.3 MW
Southwest Power Pool (SPP)175 MW
Source. Balancing authorities as listed in the queue

Changes since the June 4, 2026 snapshot

What moved in Alluvial Power's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 75 MW
0
came online
0
cancelled, inactive or dropped
2
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Alluvial PowerChange: any 3 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
3 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Alluvial Power's pipeline moves.

Request access

Alluvial Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Alluvial Power ranks 445 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
445 Alluvial Power this page 3
226.3 MW
2
230 MW
1.02

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Alluvial Power

Every Alluvial Power project

All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Alluvial PowerSort: MW, largest first 5 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
5 projects and 456.3 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Alluvial Power

We email you when Alluvial Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Alluvial Power project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.