Power developer44 projects on record Data as of

Alliant Energy has 21 planned power projects totaling 1.8 GW and 23 operating projects totaling 1.5 GW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 71% is past its listed in-service date. The projects sit in 2 states and 3 technologies.

1.8GW
planned, 21 projects
1.5GW
operating, 23 projects
1.8GW
interconnection agreement signed, 100% of planned
350.4MW
under construction, 5 projects
1.3GW
past due, 15 projects
2
states
Map

Where Alliant Energy's planned pipeline sits

Planned MW by state. The 2 largest states hold 1.8 GW of the 1.8 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Wisconsin1.2 GW15 projects, 66% of planned
  2. Iowa600 MW6 projects, 34% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1.2MW planned

for every MW Alliant Energy operates today. Solar is most of the gap.

PlannedOperating
Solar 1.6 GW
776.9 MW
Battery Storage 149 MW
274 MW
Coal none
413.7 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar191.6 GW19776.9 MW
Battery Storage2149 MW3274 MW
Coal00 MW1413.7 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.8 GW, 100%
21 of 21 planned projects (100%)
Under construction350.4 MW, 20%
5 of 21 planned projects (24%)
Past due1.3 GW, 71%
15 of 21 planned projects (71%)
71% of Alliant Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Alliant Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2022 2023 2024 2025 100.4 MW 2026 2027 425 MW 2028
View as table
YearProjectsMW
20223249.7 MW
20236413.9 MW
20245400 MW
20251200 MW
20262100.4 MW
202700 MW
20284425 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Alliant Energy's planned MW sits entirely in Midcontinent ISO (MISO).

Figure 2

Planned MW by grid operator

21 planned projects

Midcontinent ISO (MISO) 1.8 GW 21 projects
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)211.8 GW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2018 was the biggest year.

0200400600800 2017 698.8 MW 2018 2019 2020
View as table
Queue yearProjectsMW
2017150 MW
20189698.8 MW
20194364.9 MW
20205575 MW
Source. 2 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Alliant Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
1
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Alliant EnergyChange: any 2 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
2 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Alliant Energy's pipeline moves.

Request access

Alliant Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Alliant Energy ranks 96 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
96 Alliant Energy this page 21
1.8 GW
23
1.5 GW
0.82

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Alliant Energy

Every Alliant Energy project

All 44 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Alliant EnergySort: MW, largest first 44 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
44 projects and 3.3 GW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Alliant Energy

We email you when Alliant Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Alliant Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.