Akuo Energy
Akuo Energy has 2 planned power projects totaling 251.2 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 40% is past its listed in-service date. 14 contacts at the company are on file.
Where Akuo Energy's planned pipeline sits
Planned MW by state. The 2 largest states hold 251.2 MW of the 251.2 MW.
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 151.2 MW | 0 | 0 MW |
| Wind | 1 | 100 MW | 0 | 0 MW |
MW by technologySolar and Wind have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Akuo Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2021 | 1 | 100 MW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 0 | 0 MW |
| 2025 | 0 | 0 MW |
| 2026 | 0 | 0 MW |
| 2027 | 1 | 151.2 MW |
Pipeline by grid and queue year
Akuo Energy's planned MW leans on ERCOT and Midcontinent ISO (MISO). ERCOT alone holds 60% of it.
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 1 | 151.2 MW |
| Midcontinent ISO (MISO) | 1 | 100 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 1 | 100 MW |
| 2018 | 0 | 0 MW |
| 2019 | 1 | 151.2 MW |
Akuo Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Akuo Energy ranks 429 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 429 | Akuo Energy this page | 2 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Akuo Energy14 people at Akuo Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 9 managers and 2 directors are where interconnection and procurement decisions start.
By seniority
14 contacts
View as table
| Seniority | Contacts |
|---|---|
| VP | 1 |
| Director | 2 |
| Manager | 9 |
| Senior | 2 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Akuo Energy project
All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 14 contacts.
Get alerts for Akuo Energy
We email you when Akuo Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Akuo Energy project and the 14 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.