AES Indiana

Power developer1 project on record Data as of

AES Indiana has 1 planned power project totaling 100 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 100% is past its listed in-service date. The projects sit in 1 state and 1 technology.

100MW
planned, 1 project
0MW
operating, 0 projects
100MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
100MW
past due, 1 project
1
state
Map

Where AES Indiana's planned pipeline sits

Planned MW by state. Everything sits in Indiana.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Indiana100 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
100 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 100 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1100 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed100 MW, 100%
1 of 1 planned project (100%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due100 MW, 100%
1 of 1 planned project (100%)
100% of AES Indiana's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of AES Indiana's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0255075100 Snapshot year 100 MW 2025 2026
View as table
YearProjectsMW
20251100 MW
202600 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

AES Indiana's planned MW sits entirely in Midcontinent ISO (MISO).

Figure 2

Planned MW by grid operator

1 planned project

Midcontinent ISO (MISO) 100 MW 1 project
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)1100 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

0255075100 100 MW 2019
View as table
Queue yearProjectsMW
20191100 MW
Source. Every planned project has a queue date MW

AES Indiana against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. AES Indiana ranks 626 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
626 AES Indiana this page 1
100 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus AES Indiana

Every AES Indiana project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: AES IndianaSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 100 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for AES Indiana

We email you when AES Indiana adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every AES Indiana project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.