AES Clean Energy
AES Clean Energy has 61 planned power projects totaling 9.9 GW and 60 operating projects totaling 6.4 GW in the FieldProspects database. 77% of the planned capacity has an interconnection agreement and 19% is past its listed in-service date. 801 contacts at the company are on file.
Where AES Clean Energy's planned pipeline sits
Planned MW by state. The 6 largest states hold 8.8 GW of the 9.9 GW.
Largest states
- Texas3.5 GW15 projects, 35% of planned
- New York2 GW19 projects, 20% of planned
- California1.8 GW4 projects, 18% of planned
- Virginia978.2 MW5 projects, 10% of planned
- North Carolina268 MW4 projects, 3% of planned
- Missouri250 MW1 project, 3% of planned
8 more states with less.
for every MW AES Clean Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 39 | 5.2 GW | 40 | 3.2 GW |
| Wind | 9 | 2.1 GW | 3 | 900.5 MW |
| Battery Storage | 10 | 1.9 GW | 17 | 2.3 GW |
| Solar + Storage (Hybrid) | 3 | 688 MW | 0 | 0 MW |
MW by technologySolar + Storage (Hybrid) has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of AES Clean Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2022 | 2 | 345 MW |
| 2023 | 1 | 50 MW |
| 2024 | 2 | 375 MW |
| 2025 | 3 | 1.1 GW |
| 2026 | 12 | 979.5 MW |
| 2027 | 16 | 2.8 GW |
| 2028 | 15 | 2.2 GW |
| 2029 | 8 | 1.3 GW |
| 2030 | 1 | 507.6 MW |
| 2031 | 1 | 268.1 MW |
Pipeline by grid and queue year
AES Clean Energy's planned MW leans on ERCOT, New York ISO (NYISO) and California ISO (CAISO). ERCOT alone holds 31% of it.
Planned MW by grid operator
61 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 14 | 3.1 GW |
| New York ISO (NYISO) | 19 | 2 GW |
| California ISO (CAISO) | 4 | 1.8 GW |
| PJM Interconnection | 8 | 1.2 GW |
| Midcontinent ISO (MISO) | 7 | 880 MW |
| Southwest Power Pool (SPP) | 2 | 650 MW |
| Duke Energy Progress East | 2 | 108 MW |
| PacifiCorp East | 1 | 95 MW |
| Hawaiian Electric | 4 | 74 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2018 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2015 | 1 | 90.5 MW |
| 2016 | 3 | 411 MW |
| 2017 | 3 | 475 MW |
| 2018 | 5 | 1.6 GW |
| 2019 | 8 | 1.4 GW |
| 2020 | 5 | 613 MW |
| 2021 | 4 | 748.1 MW |
| 2022 | 0 | 0 MW |
| 2023 | 6 | 1.5 GW |
| 2024 | 2 | 399.9 MW |
| 2025 | 3 | 540.2 MW |
| 2026 | 4 | 650 MW |
Changes since the June 4, 2026 snapshot
What moved in AES Clean Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when AES Clean Energy's pipeline moves.
AES Clean Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. AES Clean Energy ranks 12 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 12 | AES Clean Energy this page | 61 | 60 | 0.65 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus AES Clean Energy801 people at AES Clean Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 423 managers and 125 directors are where interconnection and procurement decisions start.
By seniority
801 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 16 |
| Owner | 3 |
| Partner | 5 |
| Head | 10 |
| VP | 42 |
| Director | 125 |
| Manager | 423 |
| Senior | 175 |
| Entry | 2 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every AES Clean Energy project
All 121 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 801 contacts.
Get alerts for AES Clean Energy
We email you when AES Clean Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every AES Clean Energy project and the 801 people behind them.