Advanced Power

Power developer16 projects on record Data as of

Advanced Power has 15 planned power projects totaling 3.1 GW and 1 operating project totaling 131 MW in the FieldProspects database. 49% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 46 contacts at the company are on file.

3.1GW
planned, 15 projects
131MW
operating, 1 project
1.5GW
interconnection agreement signed, 49% of planned
200MW
under construction, 1 project
0MW
past due, 0 projects
46
contacts on file
Map

Where Advanced Power's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas3.1 GW15 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
24MW planned

for every MW Advanced Power operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 2.1 GW
none
Solar 1 GW
131 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage102.1 GW00 MW
Solar51 GW1131 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.5 GW, 49%
7 of 15 planned projects (47%)
Under construction200 MW, 6%
1 of 15 planned projects (7%)
Past due0 MW, 0%
0 of 15 planned projects (0%)
0% of Advanced Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Advanced Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
01k2k3k Snapshot year 203.2 MW 2026 2027 2.2 GW 2028
View as table
YearProjectsMW
20261203.2 MW
20273708.5 MW
2028112.2 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Advanced Power's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

15 planned projects

ERCOT 3.1 GW 15 projects
View as table
GridPlanned projectsPlanned MW
ERCOT153.1 GW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2022 was the biggest year.

0200400600800 2021 719.5 MW 2022 2023
View as table
Queue yearProjectsMW
20211203.2 MW
20223719.5 MW
20233618.3 MW
Source. 8 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Advanced Power's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Advanced PowerChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Advanced Power's pipeline moves.

Request access

Advanced Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Advanced Power ranks 51 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
51 Advanced Power this page 15
3.1 GW
1
131 MW
0.04

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Advanced Power

46 people at Advanced Power

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 11 managers and 7 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

46 contacts

C-Suite 3
Owner 1
VP 14
Director 7
Manager 11
Senior 10
View as table
SeniorityContacts
C-Suite3
Owner1
VP14
Director7
Manager11
Senior10
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 46 contacts
PersonTitleDepartmentSeniorityContact
46 contacts at Advanced Power for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Advanced Power project

All 16 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Advanced PowerSort: MW, largest first 16 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
16 projects and 3.3 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 46 contacts.

Request access

Get alerts for Advanced Power

We email you when Advanced Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Advanced Power project and the 46 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.