ACE DevCo NC, LLC
ACE DevCo NC, LLC has 5 planned power projects totaling 1.1 GW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 2 states and 4 technologies.
Where ACE DevCo NC, LLC's planned pipeline sits
Planned MW by state. The 2 largest states hold 1.1 GW of the 1.1 GW.
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 502.7 MW | 0 | 0 MW |
| Solar + Storage (Hybrid) | 2 | 260 MW | 0 | 0 MW |
| Wind | 1 | 200.5 MW | 0 | 0 MW |
| Battery Storage | 1 | 100 MW | 0 | 0 MW |
MW by technology4 technologies have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of ACE DevCo NC, LLC's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 1 | 100 MW |
| 2029 | 4 | 963.2 MW |
Pipeline by grid and queue year
ACE DevCo NC, LLC's planned MW leans on ERCOT and New York ISO (NYISO). ERCOT alone holds 66% of it.
Planned MW by grid operator
5 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 2 | 703.2 MW |
| New York ISO (NYISO) | 3 | 360 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2024 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2024 | 3 | 732.7 MW |
| 2025 | 1 | 200.5 MW |
| 2026 | 1 | 130 MW |
Changes since the June 4, 2026 snapshot
What moved in ACE DevCo NC, LLC's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when ACE DevCo NC, LLC's pipeline moves.
ACE DevCo NC, LLC against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. ACE DevCo NC, LLC ranks 157 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 157 | ACE DevCo NC, LLC this page | 5 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus ACE DevCo NC, LLCEvery ACE DevCo NC, LLC project
All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for ACE DevCo NC, LLC
We email you when ACE DevCo NC, LLC adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every ACE DevCo NC, LLC project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.