Acciona Energy
Acciona Energy has 16 planned power projects totaling 2.5 GW and 2 operating projects totaling 685 MW in the FieldProspects database. 60% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 62 contacts at the company are on file.
Where Acciona Energy's planned pipeline sits
Planned MW by state. The 4 largest states hold 2.5 GW of the 2.5 GW.
for every MW Acciona Energy operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 8 | 1.3 GW | 2 | 685 MW |
| Battery Storage | 8 | 1.2 GW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Acciona Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 4 | 821.3 MW |
| 2028 | 7 | 891.9 MW |
| 2029 | 3 | 588.5 MW |
| 2030 | 1 | 100 MW |
| 2031 | 1 | 144 MW |
Pipeline by grid and queue year
Acciona Energy's planned MW leans on ERCOT, PJM Interconnection and Southwest Power Pool (SPP). ERCOT alone holds 56% of it.
Planned MW by grid operator
16 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 7 | 1.4 GW |
| PJM Interconnection | 5 | 721 MW |
| Southwest Power Pool (SPP) | 4 | 400 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 6 | 688.5 MW |
| 2020 | 1 | 144 MW |
| 2021 | 1 | 170.9 MW |
| 2022 | 3 | 552.9 MW |
| 2023 | 0 | 0 MW |
| 2024 | 1 | 300 MW |
Changes since the June 4, 2026 snapshot
What moved in Acciona Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Acciona Energy's pipeline moves.
Acciona Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Acciona Energy ranks 64 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 64 | Acciona Energy this page | 16 | 2 | 0.27 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Acciona Energy62 people at Acciona Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 40 managers and 7 directors are where interconnection and procurement decisions start.
By seniority
62 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| Owner | 1 |
| Head | 4 |
| VP | 4 |
| Director | 7 |
| Manager | 40 |
| Senior | 5 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Acciona Energy project
All 18 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 62 contacts.
Get alerts for Acciona Energy
We email you when Acciona Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.