174 Power Global
174 Power Global has 13 planned power projects totaling 1.9 GW and 3 operating projects totaling 352 MW in the FieldProspects database. 45% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 79 contacts at the company are on file.
Where 174 Power Global's planned pipeline sits
Planned MW by state. The 6 largest states hold 1.9 GW of the 1.9 GW.
for every MW 174 Power Global operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 10 | 1.7 GW | 3 | 352 MW |
| Battery Storage | 3 | 288 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of 174 Power Global's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 4 | 407 MW |
| 2027 | 4 | 756 MW |
| 2028 | 3 | 412.5 MW |
| 2029 | 1 | 312.4 MW |
| 2030 | 0 | 0 MW |
| 2031 | 1 | 60 MW |
Pipeline by grid and queue year
174 Power Global's planned MW leans on ERCOT, California ISO (CAISO) and Nevada Power (NV Energy). ERCOT alone holds 37% of it.
Planned MW by grid operator
13 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 4 | 724.9 MW |
| California ISO (CAISO) | 3 | 500 MW |
| Nevada Power (NV Energy) | 2 | 256 MW |
| WAPA Rocky Mountain | 1 | 200 MW |
| Public Service Company of Colorado | 1 | 107 MW |
| New York ISO (NYISO) | 1 | 100 MW |
| PJM Interconnection | 1 | 60 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2025 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 2 | 200.5 MW |
| 2020 | 1 | 60 MW |
| 2021 | 0 | 0 MW |
| 2022 | 1 | 110.5 MW |
| 2023 | 0 | 0 MW |
| 2024 | 0 | 0 MW |
| 2025 | 1 | 312.4 MW |
| 2026 | 1 | 201.5 MW |
Changes since the June 4, 2026 snapshot
What moved in 174 Power Global's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when 174 Power Global's pipeline moves.
174 Power Global against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. 174 Power Global ranks 87 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 87 | 174 Power Global this page | 13 | 3 | 0.18 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus 174 Power Global79 people at 174 Power Global
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 31 managers and 23 directors are where interconnection and procurement decisions start.
By seniority
79 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 6 |
| Head | 2 |
| VP | 7 |
| Director | 23 |
| Manager | 31 |
| Senior | 10 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every 174 Power Global project
All 16 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 79 contacts.
Get alerts for 174 Power Global
We email you when 174 Power Global adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every 174 Power Global project and the 79 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.