FieldProspects

Washington County Solar

Power developer2 projects on record Data as of

Washington County Solar has 2 operating power projects totaling 350 MW in the FieldProspects database and no planned project in any queue. The projects sit in 1 state and 1 technology. Solar is its largest technology by capacity. Figures come from ISO and RTO interconnection queues and EIA-860M as of October 8, 2026.

0MW
planned, 0 projects
350MW
operating, 2 projects
1
state
1
technology
Map

Where Washington County Solar's operating fleet sits

Operating MW by state. Everything sits in Georgia.

none operating under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Georgia350 MW2 projects, 100% of operating
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
350 MWoperating

and nothing planned in any queue. All of it is already built.

PlannedOperating
Solar none
350 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar00 MW2350 MW

MW by technologyPlanned and operating MW

Washington County Solar against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Washington County Solar has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Washington County Solar this page 0
0 MW
2
350 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Washington County Solar

Every Washington County Solar project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Washington County SolarSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 350 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Washington County Solar

We email you when Washington County Solar adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Washington County Solar project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.