Power developer2 projects on record Data as of

Tucson Electric Power has 2 operating power projects totaling 400 MW in the FieldProspects database and no planned project in any queue. The projects sit in 1 state and 1 technology. Battery Storage is its largest technology by capacity. Figures come from ISO and RTO interconnection queues and EIA-860M as of October 8, 2026.

0MW
planned, 0 projects
400MW
operating, 2 projects
1
state
1
technology
Map

Where Tucson Electric Power's operating fleet sits

Operating MW by state. Everything sits in Arizona.

none operating under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Arizona400 MW2 projects, 100% of operating
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
400 MWoperating

and nothing planned in any queue. All of it is already built.

PlannedOperating
Battery Storage none
400 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage00 MW2400 MW

MW by technologyPlanned and operating MW

Changes since the June 4, 2026 snapshot

What moved in Tucson Electric Power's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
1
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Tucson Electric PowerChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Tucson Electric Power's pipeline moves.

Request access

Tucson Electric Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Tucson Electric Power has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Tucson Electric Power this page 0
0 MW
2
400 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Tucson Electric Power

Every Tucson Electric Power project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Tucson Electric PowerSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 400 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Tucson Electric Power

We email you when Tucson Electric Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Tucson Electric Power project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.