FieldProspects

Trestles Grid

Developer profile0 projects on record Data as of

Trestles Grid is in the FieldProspects developer database with no planned or operating power project attributed to it as of October 8, 2026. Industry benchmark figures, a wider measure than attributed queue rows, credit it with 1 project and 150 MW.

1
projects in industry benchmark data
150MW
capacity in industry benchmark data
0
attributed projects in this snapshot

No attributed project in this snapshot

Only a minority of queue rows name their developer, and none in the October 8, 2026 snapshot names Trestles Grid. Industry benchmark data, a wider measure, credits the company with 1 project and 150 MW. The profile fills in as filings name the developer.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects

Changes since the June 4, 2026 snapshot

What moved in Trestles Grid's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
1
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Trestles GridChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Trestles Grid's pipeline moves.

Request access

Trestles Grid against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Trestles Grid has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Trestles Grid this page 0
0 MW
0
0 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Trestles Grid

Get alerts for Trestles Grid

We email you when Trestles Grid adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Follow Trestles Grid and see its projects the moment a filing names it.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.