FieldProspects

Today's Power

Power developer6 projects on record Data as of

Today's Power has 6 operating power projects totaling 30 MW in the FieldProspects database and no planned project in any queue. 10 contacts at the company are on file. The projects sit in 1 state and 1 technology. Solar is its largest technology by capacity.

0MW
planned, 0 projects
30MW
operating, 6 projects
1
state
1
technology
10
contacts on file
Map

Where Today's Power's operating fleet sits

Operating MW by state. Everything sits in Arkansas.

none operating under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Arkansas30 MW6 projects, 100% of operating
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
30 MWoperating

and nothing planned in any queue. All of it is already built.

PlannedOperating
Solar none
30 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar00 MW630 MW

MW by technologyPlanned and operating MW

Today's Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Today's Power has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Today's Power this page 0
0 MW
6
30 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Today's Power

10 people at Today's Power

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 3 managers and 1 director are where interconnection and procurement decisions start.

Figure 1

By seniority

10 contacts

C-Suite 4
VP 1
Director 1
Manager 3
Senior 1
View as table
SeniorityContacts
C-Suite4
VP1
Director1
Manager3
Senior1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 10 contacts
PersonTitleDepartmentSeniorityContact
10 contacts at Today's Power for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Today's Power project

All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Today's PowerSort: MW, largest first 6 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
6 projects and 30 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 10 contacts.

Request access

Get alerts for Today's Power

We email you when Today's Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Today's Power project and the 10 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.