FieldProspects

Telyon

Power developer1 project on record Data as of

Telyon has 1 operating power project totaling 3.9 MW in the FieldProspects database and no planned project in any queue. 19 contacts at the company are on file. The projects sit in 1 state and 1 technology. Solar is its largest technology by capacity.

0MW
planned, 0 projects
3.9MW
operating, 1 project
1
state
1
technology
19
contacts on file
Map

Where Telyon's operating fleet sits

Operating MW by state. Everything sits in Connecticut.

none operating under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Connecticut3.9 MW1 project, 100% of operating
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
3.9 MWoperating

and nothing planned in any queue. All of it is already built.

PlannedOperating
Solar none
3.9 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar00 MW13.9 MW

MW by technologyPlanned and operating MW

Telyon against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Telyon has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Telyon this page 0
0 MW
1
3.9 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Telyon

19 people at Telyon

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 11 managers and 5 directors are where interconnection and procurement decisions start.

Figure 1

By seniority

19 contacts

Founder 1
VP 1
Director 5
Manager 11
Entry 1
View as table
SeniorityContacts
Founder1
VP1
Director5
Manager11
Entry1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 19 contacts
PersonTitleDepartmentSeniorityContact
19 contacts at Telyon for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Telyon project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: TelyonSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 3.9 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 19 contacts.

Request access

Get alerts for Telyon

We email you when Telyon adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Telyon project and the 19 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.