FieldProspects

SolAmerica

Power developer7 projects on record Data as of

SolAmerica has 1 planned power project totaling 2 MW and 6 operating projects totaling 11.1 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 25 contacts at the company are on file.

2MW
planned, 1 project
11.1MW
operating, 6 projects
2MW
interconnection agreement signed, 100% of planned
2MW
under construction, 1 project
0MW
past due, 0 projects
25
contacts on file
Map

Where SolAmerica's planned pipeline sits

Planned MW by state. Everything sits in Illinois.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Illinois2 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.2MW planned

for every MW SolAmerica operates today.

PlannedOperating
Solar 2 MW
11.1 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar12 MW611.1 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed2 MW, 100%
1 of 1 planned project (100%)
Under construction2 MW, 100%
1 of 1 planned project (100%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of SolAmerica's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of SolAmerica's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
00.511.52 Snapshot year 2 MW 2026
View as table
YearProjectsMW
202612 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

SolAmerica's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

1 planned project

PJM Interconnection 2 MW 1 project
View as table
GridPlanned projectsPlanned MW
PJM Interconnection12 MW

Changes since the June 4, 2026 snapshot

What moved in SolAmerica's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 2 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: SolAmericaChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when SolAmerica's pipeline moves.

Request access

SolAmerica against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. SolAmerica ranks 781 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
781 SolAmerica this page 1
2 MW
6
11.1 MW
5.55

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus SolAmerica

25 people at SolAmerica

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 10 managers and 5 directors are where interconnection and procurement decisions start.

Figure 3

By seniority

25 contacts

C-Suite 2
Head 1
VP 3
Director 5
Manager 10
Senior 4
View as table
SeniorityContacts
C-Suite2
Head1
VP3
Director5
Manager10
Senior4
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 25 contacts
PersonTitleDepartmentSeniorityContact
25 contacts at SolAmerica for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every SolAmerica project

All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: SolAmericaSort: MW, largest first 7 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
7 projects and 13.1 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 25 contacts.

Request access

Get alerts for SolAmerica

We email you when SolAmerica adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every SolAmerica project and the 25 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.