SolAmerica
SolAmerica has 1 planned power project totaling 2 MW and 6 operating projects totaling 11.1 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 25 contacts at the company are on file.
Where SolAmerica's planned pipeline sits
Planned MW by state. Everything sits in Illinois.
Largest states
- Illinois2 MW1 project, 100% of planned
for every MW SolAmerica operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 2 MW | 6 | 11.1 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of SolAmerica's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 2 MW |
Pipeline by grid and queue year
SolAmerica's planned MW sits entirely in PJM Interconnection.
Planned MW by grid operator
1 planned project
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 1 | 2 MW |
Changes since the June 4, 2026 snapshot
What moved in SolAmerica's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when SolAmerica's pipeline moves.
SolAmerica against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. SolAmerica ranks 781 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 781 | SolAmerica this page | 1 | 6 | 5.55 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus SolAmerica25 people at SolAmerica
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 10 managers and 5 directors are where interconnection and procurement decisions start.
By seniority
25 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Head | 1 |
| VP | 3 |
| Director | 5 |
| Manager | 10 |
| Senior | 4 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every SolAmerica project
All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 25 contacts.
Get alerts for SolAmerica
We email you when SolAmerica adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every SolAmerica project and the 25 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.