FieldProspects

Silver Peak

Power developer3 projects on record Data as of

Silver Peak has 3 operating power projects totaling 279 MW in the FieldProspects database and no planned project in any queue. 8 contacts at the company are on file. The projects sit in 1 state and 1 technology. Battery Storage is its largest technology by capacity.

0MW
planned, 0 projects
279MW
operating, 3 projects
1
state
1
technology
8
contacts on file
Map

Where Silver Peak's operating fleet sits

Operating MW by state. Everything sits in Nevada.

none operating under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Nevada279 MW3 projects, 100% of operating
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
279 MWoperating

and nothing planned in any queue. All of it is already built.

PlannedOperating
Battery Storage none
279 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage00 MW3279 MW

MW by technologyPlanned and operating MW

Silver Peak against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Silver Peak has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Silver Peak this page 0
0 MW
3
279 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Silver Peak

8 people at Silver Peak

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 manager and 4 directors are where interconnection and procurement decisions start.

Figure 1

By seniority

8 contacts

Owner 2
Director 4
Manager 1
Senior 1
View as table
SeniorityContacts
Owner2
Director4
Manager1
Senior1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 8 contacts
PersonTitleDepartmentSeniorityContact
8 contacts at Silver Peak for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Silver Peak project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Silver PeakSort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 279 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 8 contacts.

Request access

Get alerts for Silver Peak

We email you when Silver Peak adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Silver Peak project and the 8 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.