Painter Energy
Painter Energy has 1 operating power project totaling 10 MW in the FieldProspects database and no planned project in any queue. The projects sit in 1 state and 1 technology. Battery Storage is its largest technology by capacity. Figures come from ISO and RTO interconnection queues and EIA-860M as of October 8, 2026.
Where Painter Energy's operating fleet sits
Operating MW by state. Everything sits in California.
Largest states
- California10 MW1 project, 100% of operating
and nothing planned in any queue. All of it is already built.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 0 | 0 MW | 1 | 10 MW |
MW by technologyPlanned and operating MW
Changes since the June 4, 2026 snapshot
What moved in Painter Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Painter Energy's pipeline moves.
Painter Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. Painter Energy has no planned project on record, so it sits below every developer in this table.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| Painter Energy this page | 0 | 1 | no planned MW |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Painter EnergyEvery Painter Energy project
The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Painter Energy
We email you when Painter Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Painter Energy project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.