FieldProspects

Nightpeak Energy

Power developer3 projects on record Data as of

Nightpeak Energy has 2 planned power projects totaling 300.5 MW and 1 operating project totaling 150 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 11 contacts at the company are on file.

300.5MW
planned, 2 projects
150MW
operating, 1 project
300.5MW
interconnection agreement signed, 100% of planned
150MW
under construction, 1 project
0MW
past due, 0 projects
11
contacts on file
Map

Where Nightpeak Energy's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas300.5 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2MW planned

for every MW Nightpeak Energy operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 300.5 MW
150 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage2300.5 MW1150 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed300.5 MW, 100%
2 of 2 planned projects (100%)
Under construction150 MW, 50%
1 of 2 planned projects (50%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Nightpeak Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Nightpeak Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 300.5 MW 2026
View as table
YearProjectsMW
20262300.5 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Nightpeak Energy's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

2 planned projects

ERCOT 300.5 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT2300.5 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2024 was the biggest year.

050100150200 150.5 MW 2024
View as table
Queue yearProjectsMW
20241150.5 MW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in Nightpeak Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Nightpeak EnergyChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Nightpeak Energy's pipeline moves.

Request access

Nightpeak Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Nightpeak Energy ranks 401 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
401 Nightpeak Energy this page 2
300.5 MW
1
150 MW
0.50

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Nightpeak Energy

11 people at Nightpeak Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 managers and 5 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

11 contacts

C-Suite 4
Director 5
Manager 2
View as table
SeniorityContacts
C-Suite4
Director5
Manager2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 11 contacts
PersonTitleDepartmentSeniorityContact
11 contacts at Nightpeak Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Nightpeak Energy project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Nightpeak EnergySort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 450.5 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 11 contacts.

Request access

Get alerts for Nightpeak Energy

We email you when Nightpeak Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Nightpeak Energy project and the 11 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.