New Energy Equity
New Energy Equity has 5 operating power projects totaling 9 MW in the FieldProspects database and no planned project in any queue. 38 contacts at the company are on file. The projects sit in 2 states and 1 technology. Solar is its largest technology by capacity.
Where New Energy Equity's operating fleet sits
Operating MW by state. The 2 largest states hold 9 MW of the 9 MW.
and nothing planned in any queue. All of it is already built.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 0 | 0 MW | 5 | 9 MW |
MW by technologyPlanned and operating MW
New Energy Equity against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. New Energy Equity has no planned project on record, so it sits below every developer in this table.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| New Energy Equity this page | 0 | 5 | no planned MW |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus New Energy Equity38 people at New Energy Equity
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 11 managers and 10 directors are where interconnection and procurement decisions start.
By seniority
38 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Partner | 1 |
| VP | 4 |
| Director | 10 |
| Manager | 11 |
| Senior | 7 |
| Entry | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every New Energy Equity project
All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 38 contacts.
Get alerts for New Energy Equity
We email you when New Energy Equity adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every New Energy Equity project and the 38 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.