Nevada Gold Mines
Nevada Gold Mines has 3 operating power projects totaling 442 MW in the FieldProspects database and no planned project in any queue. The projects sit in 1 state and 2 technologies. Coal is its largest technology by capacity. Figures come from ISO and RTO interconnection queues and EIA-860M as of October 8, 2026.
Where Nevada Gold Mines' operating fleet sits
Operating MW by state. Everything sits in Nevada.
Largest states
- Nevada442 MW3 projects, 100% of operating
and nothing planned in any queue. All of it is already built.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Coal | 0 | 0 MW | 1 | 242 MW |
| Solar | 0 | 0 MW | 2 | 200 MW |
MW by technologyPlanned and operating MW
Nevada Gold Mines against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. Nevada Gold Mines has no planned project on record, so it sits below every developer in this table.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| Nevada Gold Mines this page | 0 | 3 | no planned MW |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Nevada Gold MinesEvery Nevada Gold Mines project
All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Nevada Gold Mines
We email you when Nevada Gold Mines adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Nevada Gold Mines project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.