Mohave Electric Coop
Mohave Electric Coop has 2 operating power projects totaling 25.9 MW in the FieldProspects database and no planned project in any queue. The projects sit in 1 state and 2 technologies. Battery Storage is its largest technology by capacity. Figures come from ISO and RTO interconnection queues and EIA-860M as of October 8, 2026.
Where Mohave Electric Coop's operating fleet sits
Operating MW by state. Everything sits in Arizona.
Largest states
- Arizona25.9 MW2 projects, 100% of operating
and nothing planned in any queue. All of it is already built.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 0 | 0 MW | 1 | 15 MW |
| Solar | 0 | 0 MW | 1 | 10.9 MW |
MW by technologyPlanned and operating MW
Mohave Electric Coop against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. Mohave Electric Coop has no planned project on record, so it sits below every developer in this table.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| Mohave Electric Coop this page | 0 | 2 | no planned MW |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Mohave Electric CoopEvery Mohave Electric Coop project
All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Mohave Electric Coop
We email you when Mohave Electric Coop adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Mohave Electric Coop project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.