Madison Energy Infrastructure

Power developer25 projects on record Data as of

Madison Energy Infrastructure has 1 planned power project totaling 4.9 MW and 24 operating projects totaling 78 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 73 contacts at the company are on file.

4.9MW
planned, 1 project
78MW
operating, 24 projects
4.9MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
73
contacts on file
Map

Where Madison Energy Infrastructure's planned pipeline sits

Planned MW by state. Everything sits in Illinois.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Illinois4.9 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.1MW planned

for every MW Madison Energy Infrastructure operates today.

PlannedOperating
Solar 4.9 MW
75.5 MW
Battery Storage none
2.5 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar14.9 MW2175.5 MW
Battery Storage00 MW32.5 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed4.9 MW, 100%
1 of 1 planned project (100%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of Madison Energy Infrastructure's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Madison Energy Infrastructure's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0246 Snapshot year 4.9 MW 2026
View as table
YearProjectsMW
202614.9 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Madison Energy Infrastructure's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

1 planned project

PJM Interconnection 4.9 MW 1 project
View as table
GridPlanned projectsPlanned MW
PJM Interconnection14.9 MW

Changes since the June 4, 2026 snapshot

What moved in Madison Energy Infrastructure's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Madison Energy InfrastructureChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Madison Energy Infrastructure's pipeline moves.

Request access

Madison Energy Infrastructure against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Madison Energy Infrastructure ranks 768 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
768 Madison Energy Infrastructure this page 1
4.9 MW
24
78 MW
15.92

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Madison Energy Infrastructure

73 people at Madison Energy Infrastructure

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 24 managers and 15 directors are where interconnection and procurement decisions start.

Figure 3

By seniority

73 contacts

C-Suite 6
Founder 1
VP 12
Director 15
Manager 24
Senior 15
View as table
SeniorityContacts
C-Suite6
Founder1
VP12
Director15
Manager24
Senior15
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 73 contacts
PersonTitleDepartmentSeniorityContact
73 contacts at Madison Energy Infrastructure for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Madison Energy Infrastructure project

All 25 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Madison Energy InfrastructureSort: MW, largest first 25 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
25 projects and 82.9 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 73 contacts.

Request access

Get alerts for Madison Energy Infrastructure

We email you when Madison Energy Infrastructure adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Madison Energy Infrastructure project and the 73 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.