FieldProspects

Kearsarge Energy

Power developer4 projects on record Data as of

Kearsarge Energy has 1 planned power project totaling 4 MW and 3 operating projects totaling 30 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 13 contacts at the company are on file.

4MW
planned, 1 project
30MW
operating, 3 projects
4MW
interconnection agreement signed, 100% of planned
4MW
under construction, 1 project
0MW
past due, 0 projects
13
contacts on file
Map

Where Kearsarge Energy's planned pipeline sits

Planned MW by state. Everything sits in New Hampshire.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. New Hampshire4 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.1MW planned

for every MW Kearsarge Energy operates today.

PlannedOperating
Solar 4 MW
20 MW
Battery Storage none
10 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar14 MW120 MW
Battery Storage00 MW210 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed4 MW, 100%
1 of 1 planned project (100%)
Under construction4 MW, 100%
1 of 1 planned project (100%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of Kearsarge Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Kearsarge Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
01234 Snapshot year 4 MW 2026
View as table
YearProjectsMW
202614 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Kearsarge Energy's planned MW sits entirely in ISO New England.

Figure 2

Planned MW by grid operator

1 planned project

ISO New England 4 MW 1 project
View as table
GridPlanned projectsPlanned MW
ISO New England14 MW

Changes since the June 4, 2026 snapshot

What moved in Kearsarge Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 4 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Kearsarge EnergyChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Kearsarge Energy's pipeline moves.

Request access

Kearsarge Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Kearsarge Energy ranks 772 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
772 Kearsarge Energy this page 1
4 MW
3
30 MW
7.50

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Kearsarge Energy

13 people at Kearsarge Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 4 managers and 5 directors are where interconnection and procurement decisions start.

Figure 3

By seniority

13 contacts

Partner 1
VP 2
Director 5
Manager 4
Senior 1
View as table
SeniorityContacts
Partner1
VP2
Director5
Manager4
Senior1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 13 contacts
PersonTitleDepartmentSeniorityContact
13 contacts at Kearsarge Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Kearsarge Energy project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Kearsarge EnergySort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 34 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 13 contacts.

Request access

Get alerts for Kearsarge Energy

We email you when Kearsarge Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Kearsarge Energy project and the 13 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.