Kearsarge Energy has 1 planned power project totaling 4 MW and 3 operating projects totaling 30 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 13 contacts at the company are on file.
Where Kearsarge Energy's planned pipeline sits
Planned MW by state. Everything sits in New Hampshire.
Largest states
- New Hampshire4 MW1 project, 100% of planned
for every MW Kearsarge Energy operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 4 MW | 1 | 20 MW |
| Battery Storage | 0 | 0 MW | 2 | 10 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Kearsarge Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 4 MW |
Pipeline by grid and queue year
Kearsarge Energy's planned MW sits entirely in ISO New England.
Planned MW by grid operator
1 planned project
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ISO New England | 1 | 4 MW |
Changes since the June 4, 2026 snapshot
What moved in Kearsarge Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Kearsarge Energy's pipeline moves.
Kearsarge Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Kearsarge Energy ranks 772 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 772 | Kearsarge Energy this page | 1 | 3 | 7.50 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Kearsarge Energy13 people at Kearsarge Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 4 managers and 5 directors are where interconnection and procurement decisions start.
By seniority
13 contacts
View as table
| Seniority | Contacts |
|---|---|
| Partner | 1 |
| VP | 2 |
| Director | 5 |
| Manager | 4 |
| Senior | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Kearsarge Energy project
All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 13 contacts.
Get alerts for Kearsarge Energy
We email you when Kearsarge Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Kearsarge Energy project and the 13 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.