FieldProspects

Kansas City Power & Light

Developer profile0 projects on record Data as of

Kansas City Power & Light is in the FieldProspects developer database with no planned or operating power project attributed to it as of October 8, 2026. Industry benchmark figures, a wider measure than attributed queue rows, credit it with 2 projects and 252 MW.

2
projects in industry benchmark data
252MW
capacity in industry benchmark data
0
attributed projects in this snapshot

No attributed project in this snapshot

Only a minority of queue rows name their developer, and none in the October 8, 2026 snapshot names Kansas City Power & Light. Industry benchmark data, a wider measure, credits the company with 2 projects and 252 MW. The profile fills in as filings name the developer.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects

Kansas City Power & Light against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Kansas City Power & Light has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Kansas City Power & Light this page 0
0 MW
0
0 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Kansas City Power & Light

Get alerts for Kansas City Power & Light

We email you when Kansas City Power & Light adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

Follow Kansas City Power & Light and see its projects the moment a filing names it.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.