FieldProspects

Hitachi Energy

Power developer1 project on record Data as of

Hitachi Energy has 1 operating power project totaling 2.5 MW in the FieldProspects database and no planned project in any queue. The projects sit in 1 state and 1 technology. Battery Storage is its largest technology by capacity. Figures come from ISO and RTO interconnection queues and EIA-860M as of October 8, 2026.

0MW
planned, 0 projects
2.5MW
operating, 1 project
1
state
1
technology
Map

Where Hitachi Energy's operating fleet sits

Operating MW by state. Everything sits in Maryland.

none operating under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Maryland2.5 MW1 project, 100% of operating
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2.5 MWoperating

and nothing planned in any queue. All of it is already built.

PlannedOperating
Battery Storage none
2.5 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage00 MW12.5 MW

MW by technologyPlanned and operating MW

Hitachi Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Hitachi Energy has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Hitachi Energy this page 0
0 MW
1
2.5 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Hitachi Energy

Every Hitachi Energy project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Hitachi EnergySort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 2.5 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Hitachi Energy

We email you when Hitachi Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Hitachi Energy project, with its county, dates and queue status.