Energy Ventures
Energy Ventures is in the FieldProspects developer database with no planned or operating power project attributed to it as of October 8, 2026. Industry benchmark figures, a wider measure than attributed queue rows, credit it with 2 projects and 40 MW.
No attributed project in this snapshot
Only a minority of queue rows name their developer, and none in the October 8, 2026 snapshot names Energy Ventures. Industry benchmark data, a wider measure, credits the company with 2 projects and 40 MW. The profile fills in as filings name the developer.
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects
Energy Ventures against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. Energy Ventures has no planned project on record, so it sits below every developer in this table.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| Energy Ventures this page | 0 | 0 | no planned MW |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Energy VenturesGet alerts for Energy Ventures
We email you when Energy Ventures adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
Follow Energy Ventures and see its projects the moment a filing names it.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.