Castleton Commodities

Power developer1 project on record Data as of

Castleton Commodities has 1 planned power project totaling 122.8 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 142 contacts at the company are on file.

122.8MW
planned, 1 project
0MW
operating, 0 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
142
contacts on file
Map

Where Castleton Commodities' planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas122.8 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
122.8 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 122.8 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage1122.8 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 1 planned project (0%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of Castleton Commodities' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Castleton Commodities' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150 Snapshot year 2026 2027 2028 2029 122.8 MW 2030
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
202900 MW
20301122.8 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Castleton Commodities' planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

1 planned project

ERCOT 122.8 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT1122.8 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2024 was the biggest year.

050100150 122.8 MW 2024
View as table
Queue yearProjectsMW
20241122.8 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Castleton Commodities' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Castleton CommoditiesChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Castleton Commodities' pipeline moves.

Request access

Castleton Commodities against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Castleton Commodities ranks 593 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
593 Castleton Commodities this page 1
122.8 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Castleton Commodities

142 people at Castleton Commodities

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 7 managers and 53 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

142 contacts

C-Suite 7
Partner 2
Head 21
VP 48
Director 53
Manager 7
Senior 4
View as table
SeniorityContacts
C-Suite7
Partner2
Head21
VP48
Director53
Manager7
Senior4
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 142 contacts
PersonTitleDepartmentSeniorityContact
142 contacts at Castleton Commodities for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Castleton Commodities project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Castleton CommoditiesSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 122.8 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 142 contacts.

Request access

Get alerts for Castleton Commodities

We email you when Castleton Commodities adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Castleton Commodities project and the 142 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.