FieldProspects

Castleman Power

Power developer1 project on record Data as of

Castleman Power has 1 operating power project totaling 200 MW in the FieldProspects database and no planned project in any queue. The projects sit in 1 state and 1 technology. Battery Storage is its largest technology by capacity. Figures come from ISO and RTO interconnection queues and EIA-860M as of October 8, 2026.

0MW
planned, 0 projects
200MW
operating, 1 project
1
state
1
technology
Map

Where Castleman Power's operating fleet sits

Operating MW by state. Everything sits in Texas.

none operating under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas200 MW1 project, 100% of operating
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
200 MWoperating

and nothing planned in any queue. All of it is already built.

PlannedOperating
Battery Storage none
200 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage00 MW1200 MW

MW by technologyPlanned and operating MW

Castleman Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Castleman Power has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Castleman Power this page 0
0 MW
1
200 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Castleman Power

Every Castleman Power project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Castleman PowerSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 200 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Castleman Power

We email you when Castleman Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Castleman Power project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.