Carolina Solar Energy
Carolina Solar Energy has 1 operating power project totaling 55 MW in the FieldProspects database and no planned project in any queue. The projects sit in 1 state and 1 technology. Solar is its largest technology by capacity. Figures come from ISO and RTO interconnection queues and EIA-860M as of October 8, 2026.
Where Carolina Solar Energy's operating fleet sits
Operating MW by state. Everything sits in Kentucky.
Largest states
- Kentucky55 MW1 project, 100% of operating
and nothing planned in any queue. All of it is already built.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 0 | 0 MW | 1 | 55 MW |
MW by technologyPlanned and operating MW
Carolina Solar Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. Carolina Solar Energy has no planned project on record, so it sits below every developer in this table.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| Carolina Solar Energy this page | 0 | 1 | no planned MW |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Carolina Solar EnergyEvery Carolina Solar Energy project
The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Carolina Solar Energy
We email you when Carolina Solar Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Carolina Solar Energy project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.