FieldProspects

Bowersock Mills & Power Co

Power developer2 projects on record Data as of

Bowersock Mills & Power Co has 1 planned power project totaling 5 MW and 1 operating project totaling 5 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date.

5MW
planned, 1 project
5MW
operating, 1 project
5MW
interconnection agreement signed, 100% of planned
5MW
under construction, 1 project
0MW
past due, 0 projects
1
state
Map

Where Bowersock Mills & Power Co's planned pipeline sits

Planned MW by state. Everything sits in New Mexico.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. New Mexico5 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1MW planned

for every MW Bowersock Mills & Power Co operates today.

PlannedOperating
Solar 5 MW
5 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar15 MW15 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed5 MW, 100%
1 of 1 planned project (100%)
Under construction5 MW, 100%
1 of 1 planned project (100%)
Past due0 MW, 0%
0 of 1 planned project (0%)
None of Bowersock Mills & Power Co's planned MW sits in the seven ISO queues, where 11% of planned MW is past due across all developers.

Share of Bowersock Mills & Power Co's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0246 Snapshot year 5 MW 2026
View as table
YearProjectsMW
202615 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Bowersock Mills & Power Co's planned MW sits entirely in PNM Resources.

Figure 2

Planned MW by grid operator

1 planned project

PNM Resources 5 MW 1 project
View as table
GridPlanned projectsPlanned MW
PNM Resources15 MW

Changes since the June 4, 2026 snapshot

What moved in Bowersock Mills & Power Co's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Bowersock Mills & Power CoChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Bowersock Mills & Power Co's pipeline moves.

Request access

Bowersock Mills & Power Co against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Bowersock Mills & Power Co ranks 764 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
764 Bowersock Mills & Power Co this page 1
5 MW
1
5 MW
1.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Bowersock Mills & Power Co

Every Bowersock Mills & Power Co project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Bowersock Mills & Power CoSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 10 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Bowersock Mills & Power Co

We email you when Bowersock Mills & Power Co adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Bowersock Mills & Power Co project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.