Arizona G&T Cooperatives
Arizona G&T Cooperatives has 3 operating power projects totaling 40 MW in the FieldProspects database and no planned project in any queue. The projects sit in 1 state and 2 technologies. Battery Storage is its largest technology by capacity. Figures come from ISO and RTO interconnection queues and EIA-860M as of October 8, 2026.
Where Arizona G&T Cooperatives' operating fleet sits
Operating MW by state. Everything sits in Arizona.
Largest states
- Arizona40 MW3 projects, 100% of operating
and nothing planned in any queue. All of it is already built.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 0 | 0 MW | 2 | 20 MW |
| Solar | 0 | 0 MW | 1 | 20 MW |
MW by technologyPlanned and operating MW
Arizona G&T Cooperatives against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. Arizona G&T Cooperatives has no planned project on record, so it sits below every developer in this table.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| Arizona G&T Cooperatives this page | 0 | 3 | no planned MW |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Arizona G&T CooperativesEvery Arizona G&T Cooperatives project
All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Arizona G&T Cooperatives
We email you when Arizona G&T Cooperatives adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Arizona G&T Cooperatives project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.