Arizona G&T Cooperatives

Power developer3 projects on record Data as of

Arizona G&T Cooperatives has 3 operating power projects totaling 40 MW in the FieldProspects database and no planned project in any queue. The projects sit in 1 state and 2 technologies. Battery Storage is its largest technology by capacity. Figures come from ISO and RTO interconnection queues and EIA-860M as of October 8, 2026.

0MW
planned, 0 projects
40MW
operating, 3 projects
1
state
2
technologies
Map

Where Arizona G&T Cooperatives' operating fleet sits

Operating MW by state. Everything sits in Arizona.

none operating under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Arizona40 MW3 projects, 100% of operating
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
40 MWoperating

and nothing planned in any queue. All of it is already built.

PlannedOperating
Battery Storage none
20 MW
Solar none
20 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage00 MW220 MW
Solar00 MW120 MW

MW by technologyPlanned and operating MW

Arizona G&T Cooperatives against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Arizona G&T Cooperatives has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Arizona G&T Cooperatives this page 0
0 MW
3
40 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Arizona G&T Cooperatives

Every Arizona G&T Cooperatives project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Arizona G&T CooperativesSort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 40 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Arizona G&T Cooperatives

We email you when Arizona G&T Cooperatives adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Arizona G&T Cooperatives project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.