Alterra Power

Power developer1 project on record Data as of

Alterra Power has 1 operating power project totaling 329.8 MW in the FieldProspects database and no planned project in any queue. The projects sit in 1 state and 1 technology. Wind is its largest technology by capacity. Figures come from ISO and RTO interconnection queues and EIA-860M as of October 8, 2026.

0MW
planned, 0 projects
329.8MW
operating, 1 project
1
state
1
technology
Map

Where Alterra Power's operating fleet sits

Operating MW by state. Everything sits in Wyoming.

none operating under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Wyoming329.8 MW1 project, 100% of operating
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
329.8 MWoperating

and nothing planned in any queue. All of it is already built.

PlannedOperating
Wind none
329.8 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind00 MW1329.8 MW

MW by technologyPlanned and operating MW

Alterra Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Alterra Power has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Alterra Power this page 0
0 MW
1
329.8 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Alterra Power

Every Alterra Power project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Alterra PowerSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 329.8 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Alterra Power

We email you when Alterra Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Alterra Power project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.