FieldProspects

Adapture Renewables

Power developer2 projects on record Data as of

Adapture Renewables has 2 operating power projects totaling 229.9 MW in the FieldProspects database and no planned project in any queue. 40 contacts at the company are on file. The projects sit in 1 state and 1 technology. Battery Storage is its largest technology by capacity.

0MW
planned, 0 projects
229.9MW
operating, 2 projects
1
state
1
technology
40
contacts on file
Map

Where Adapture Renewables' operating fleet sits

Operating MW by state. Everything sits in Texas.

none operating under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas229.9 MW2 projects, 100% of operating
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
229.9 MWoperating

and nothing planned in any queue. All of it is already built.

PlannedOperating
Battery Storage none
229.9 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage00 MW2229.9 MW

MW by technologyPlanned and operating MW

Adapture Renewables against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. Adapture Renewables has no planned project on record, so it sits below every developer in this table.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
Adapture Renewables this page 0
0 MW
2
229.9 MW
no planned MW

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Adapture Renewables

40 people at Adapture Renewables

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 18 managers and 8 directors are where interconnection and procurement decisions start.

Figure 1

By seniority

40 contacts

C-Suite 2
Head 2
VP 7
Director 8
Manager 18
Senior 2
Unknown 1
View as table
SeniorityContacts
C-Suite2
Head2
VP7
Director8
Manager18
Senior2
Unknown1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 40 contacts
PersonTitleDepartmentSeniorityContact
40 contacts at Adapture Renewables for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Adapture Renewables project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Adapture RenewablesSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 229.9 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 40 contacts.

Request access

Get alerts for Adapture Renewables

We email you when Adapture Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Adapture Renewables project and the 40 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.