Data center site selection: compare planned power by state

FieldProspects helps data center teams compare where power is planned with where data centers are going. The database holds 3,626 data centers that are not canceled, with 453.5 GW of stated capacity, beside 8,057 planned power projects totaling 1,547.4 GW, broken out by state.

Data as of

Siting is a power question now, and planned generation is unevenly spread. Texas leads every state on planned generation with 555.1 GW and on stated data center capacity with 105.3 GW.

The steps below compare the two measures by state, show how far the data center pipeline has moved, and look at the grid operators behind the states.

What is data center site selection?

Data center site selection is the process of choosing where to build a data center, weighing power supply, land, network access and cost. This page covers the power side: where generation is planned and how much capacity data centers state.

Step 1: Put planned generation beside data center demand

The table shows the 10 states that lead on either measure. Planned per DC MW divides planned generation by the capacity data centers state. Data centers counts every record that is not canceled. Utah is lowest at 0.12 and California highest at 48.26.

Use the ratio to choose where to look first, not as a measure of spare capacity. Planned capacity is nameplate, not delivered supply, and 496 of the 3,626 data centers state no capacity, so the demand side is understated.

States that lead on planned generation or on data center capacity
StatePlanned capacityData centersData center MW, statedPlanned per DC MW
Texas 555.1 GW 535 105.3 GW 5.27
California 146.1 GW 85 3 GW 48.26
Illinois 97.2 GW 112 11.3 GW 8.63
Virginia 63 GW 853 58.5 GW 1.08
Indiana 59.2 GW 155 16.9 GW 3.50
Michigan 45.9 GW 18 2.9 GW 15.60
Ohio 41.5 GW 246 29.2 GW 1.42
Pennsylvania 33.7 GW 150 18.5 GW 1.82
Georgia 6.9 GW 180 19.4 GW 0.35
Utah 3.8 GW 69 32.8 GW 0.12

Step 2: See how far the data center pipeline has moved

Of 3,626 data centers that are not canceled, 1,807 are planned, 477 are under construction and 1,319 are operating. The 45 canceled records are left out of every figure on this page.

Filter the Data centers table by status and state to separate what is under construction from what is only planned. Each row carries load, acreage, footprint and capex where the source states them.

Data centers in the database by status, canceled records excluded
StatusData centersStating a capacityStated capacity
Planned 1,807 1,402 344.4 GW
Under Construction 477 464 47 GW
Operating 1,319 1,264 62.2 GW
Status not stated 23 0 None

Step 3: Check the grid behind the state

Generation queues are run by grid operators, not states. ERCOT holds 532.2 GW of planned capacity, MISO holds 301.4 GW and PJM holds 260.3 GW. A state that looks short on planned generation may sit inside a grid with a deep queue, so filter the Planned table by balancing authority as well as by state.

Step 4: Map it, with the gaps in mind

Map mode shows projects and data centers together, colored by technology or status, under the same filters as the table. Coordinates are on file for 28.9% of planned projects, so the map shows a subset of the queue.

A grid is on file for 99.9% of planned projects, so state and grid filters reach nearly all of them. CSV or Excel export returns exactly the list you filtered.

Source. Power projects: U.S. Energy Information Administration Form EIA-860M and ISO/RTO interconnection queues, compiled by FieldProspects. Data centers: Public announcements, permits and company filings, compiled by FieldProspects.